Does Vectorize.io keep results to the selected documents when a search is scoped?
Vectorize.io returned only Nordic passages when the search was limited to Nordic-region documents, leaving out the UK document containing the answer. The same search without the region limit did return that document.
1 of 1 test case passed
Every test case in this scenario has a result.
The test case
Each test case is judged on its own: Pass, Fail, Not gradable, or Untested. The scenario result above is based on this test case.
Search restricted to the subset that does not hold the answerPassEvidence
Both files were re-uploaded with their region tags, and the pipeline was refreshed.
{"question": "Which depot holds the Tolvan A3 loan pool?", "numResults": 5, "metadata-filters": [{"metadata.region": ["nordic"]}]}{"question": "Which depot holds the Tolvan A3 loan pool?", "numResults": 5, "metadata-filters": [{"metadata.region": ["uk"]}]}{"question": "Which depot holds the Tolvan A3 loan pool?", "numResults": 5}{"question": "Which depot holds the Tolvan A3 loan pool?", "numResults": 5, "metadata-filters": [{"origin": ["file-upload"]}]}{"question": "Which depot holds the Tolvan A3 loan pool?", "numResults": 5, "metadata-filters": [{"region": ["nordic"]}]}Copied from Output file (text), lines 189–194, 289–292, 294–368, 544–549, 724–727
TC93 full evidence: search restricted to the subset that does not hold the answer Question: Which depot holds the Tolvan A3 loan pool? Answering file: A05_depot_and_commissioning_note.md (region = uk). Other file: A06_nordic_service_addendum.docx (region = nordic). === Tags saved on the two files (connector file list) === A05_depot_and_commissioning_note.md metadata={'region': 'uk'} lastModified=2026-10-14T08:49:37.000Z A06_nordic_service_addendum.docx metadata={'region': 'nordic'} lastModified=2026-10-14T08:49:44.000Z ==================================================================================================== 1. No filter request body: {"question": "Which depot holds the Tolvan A3 loan pool?", "numResults": 5} response: HTTP 200, 5 results, answering file returned: YES --- result 1: A05_depot_and_commissioning_note.md chunk 0 of 2 relevancy=0.9999 similarity=0.7437 # Depot, spares and commissioning - working note Bristol depot and UK commissioning engineers. Not a contractual document. ## The depot The Bristol depot sits behind the workshop on the Avonmouth side and is open 07:00 to 17:00, Monday to Friday. Out of hours, the duty engineer holds a key and may draw stock, recording what was taken on the ticket before leaving the building. ## Loan stock The Bristol depot holds the Tolvan A3 loan pool: six calibrated units reserved for Critical cover customers. A loan unit goes out configured for the customer's deployment, with a current certificate in the case, so that it can be rigged without a bench check. Loan units are issued against a signed loan note naming the ticket, the serial number that went out and the serial number it stands in for. The stores controller counts loan stock on the first working day of each month. A customer on Standard or Extended cover may borrow a unit where one is free, but has no reservation on it: a Critical cover customer takes precedence and the borrowed unit is recalled with two working days' notice. ## Consumable stock Anodes, anti-fouling guards and gland kits are held as rolling stock and reordered at the reorder level marked on the bin. The stores controller reviews reorder levels each quarter against the previous four quarters of consumption. ## Couriers The courier cut-off is 15:30 for next-day delivery within the United Kingdom. Anything handed over after the cut-off travels the following working day. Dangerous goods - which means any lithium cell over the threshold on the shipping matrix - need the packing declaration signed by a trained shipper, and there are two in the building. ## What the depot does not do The depot does not calibrate. An instrument that needs a certificate goes to the laboratory, is booked in under its own job number, and comes back to the depot only once the certificate has been signed. ## Commissioning: before travelling --- result 2: A06_nordic_service_addendum.docx chunk 0 of 3 relevancy=0.9676 similarity=0.7571 Nordic Service Addendum Fenwake Instruments Ltd - Norway, Sweden and Denmark 1. What this addendum covers This addendum sets out how service work is delivered for customers in Norway, Sweden and Denmark. It covers logistics, customs, mobilisation, the regional depot and how loan stock is requested. It does not restate commercial terms, and it does not describe the goods warranty carried by a new instrument. 2. Regional depot The regional depot is at Bergen, on the Damsgard side of the harbour, and is open 07:00 to 16:00 local time, Monday to Friday. It is staffed by two engineers and a stores controller. 2.1 What the depot holds Item Held at Bergen Note Brannoc loan pool Two units Issued against a signed loan note Tolvan C5 spares kit One full kit Pressure housings, o-ring sets, end caps Consumables Rolling stock Anodes, guards, gland kits Deck cable, armoured 300 m drum Cut to length on request --- result 3: A10_tolvan_a3_product_overview.md chunk 0 of 2 relevancy=0.8302 similarity=0.7045 # Tolvan A3 - product overview The Tolvan A3 is a conductivity and temperature sensor built for continuous deployment in estuarine and coastal water. It is the instrument most of our customers meet first, and most of the questions the service desk answers are about this one. ## What it measures The instrument reports conductivity, temperature and a derived practical salinity. Conductivity is measured with an inductive cell, which has no exposed electrodes to foul or to wear, and temperature with a thermistor mounted in the same flow path so that the two readings describe the same parcel of water. Pressure is not measured; where a depth record is needed, the instrument is paired with a separate pressure sensor on the same mooring. ## Where it is used Typical deployments are estuary monitoring for a regulator, intake monitoring for a water treatment works, and baseline surveys ahead of construction in a harbour. It is rated for continuous immersion to fifty metres. Deeper work uses the Tolvan C5, which shares the sensing arrangement in a pressure housing rated considerably deeper. ## How it is powered and read On a mooring, the instrument runs from an internal battery pack and logs to internal memory. On a cabled installation it is powered over the same cable that carries its data, and reports continuously to the Brannoc telemetry gateway, which forwards to the customer's own system. The two modes are configured at commissioning and are not switched in the field. ## Fouling and cleaning In estuarine water the practical limit on deployment is biological fouling rather than power or memory. An anti-fouling guard and a sacrificial anode are fitted at commissioning and replaced at each service visit. Customers in warm or nutrient-rich water are advised to shorten the interval between visits rather than to clean the sensing face themselves, because the inductive cell is easily damaged by an abrasive. ## Calibration Every instrument leaves the laboratory with a signed certificate recording the as-found and as-left bias at four reference points across the working range. The recommended recalibration interval for the Tolvan A3 is 22 months from the date of the last certificate. An instrument returned early because of a suspected drift is checked as found before anything is adjusted, so that the drift can be quantified rather than merely corrected. --- result 4: A06_nordic_service_addendum.docx chunk 1 of 3 relevancy=0.2473 similarity=0.7651 Loan pool stock is counted on the first working day of each month and the count is sent to the service desk lead the same day. A discrepancy is investigated before the next issue. 3. Requesting a loan unit 3.1 Who to call Loan requests from customers in the region are met from the Bergen depot. Ring the depot rather than raising a stores request in the system: the stores queue is worked from the workshop and adds a day to anything that could have been handed over the counter. 3.2 What can be lent The Bergen loan pool covers the Brannoc telemetry gateway. A gateway goes out with its own SIM and a configuration file matching the customer's deployment. Where a customer needs an instrument the depot does not hold as loan stock, the depot raises a request against central stores and tells the customer the same day what can and cannot be met locally. Do not promise a loan unit before the depot has confirmed one is free. 3.3 The loan note Every loan is recorded on a signed loan note carrying the ticket number, the serial number issued and the date it is due back. Ten working days is the standard loan period, counted from the day the customer's own instrument is returned to service. An overdue loan is chased by the stores controller at ten and at twenty working days, and after that by the service desk lead. 3.4 Condition on return A returned loan unit is inspected, cleaned and re-certified before it goes back into the pool. A unit returned with a broken calibration seal is treated as damaged, quoted for repair, and does not go back into the pool until the laboratory has passed it. 4. Customs and export Instruments moving between the workshop and a Norwegian site travel under a temporary admission carnet. The carnet number goes on the ticket before the instrument leaves the building; an instrument that travels without one is held at the border and the ticket clock is suspended until it is released. 4.1 Repairs that cross a border Where a repair cannot be completed at Bergen and the instrument must return to the workshop, the depot raises a return note and the customer is told the same day. Return shipping is arranged by the depot, never by the customer, so that the carnet stays valid. 5. Mobilisation --- result 5: A06_nordic_service_addendum.docx chunk 2 of 3 relevancy=0.0000 similarity=0.6670 5. Mobilisation Offshore attendance in the region is mobilised through the customer's own vessel wherever one is available. Where it is not, the depot charters through a local agent. Mobilisation requires offshore survival certification current on the day of sailing, and the depot checks certification before booking. 6. Language Service reports are written in English. On request, the depot provides a Norwegian summary of the findings and the actions taken, prepared by the stores controller and checked by the attending engineer. 7. Subcontractors Two subcontractors are approved for lifting and diving support in the region: Hordaland Subsea AS and Kattegat Marine Services. Neither is authorised to open an instrument or to break a calibration seal. ==================================================================================================== 2. region = uk request body: {"question": "Which depot holds the Tolvan A3 loan pool?", "numResults": 5, "metadata-filters": [{"metadata.region": ["uk"]}]} response: HTTP 200, 2 results, answering file returned: YES --- result 1: A05_depot_and_commissioning_note.md chunk 0 of 2 relevancy=0.9999 similarity=0.7437 # Depot, spares and commissioning - working note Bristol depot and UK commissioning engineers. Not a contractual document. ## The depot The Bristol depot sits behind the workshop on the Avonmouth side and is open 07:00 to 17:00, Monday to Friday. Out of hours, the duty engineer holds a key and may draw stock, recording what was taken on the ticket before leaving the building. ## Loan stock The Bristol depot holds the Tolvan A3 loan pool: six calibrated units reserved for Critical cover customers. A loan unit goes out configured for the customer's deployment, with a current certificate in the case, so that it can be rigged without a bench check. Loan units are issued against a signed loan note naming the ticket, the serial number that went out and the serial number it stands in for. The stores controller counts loan stock on the first working day of each month. A customer on Standard or Extended cover may borrow a unit where one is free, but has no reservation on it: a Critical cover customer takes precedence and the borrowed unit is recalled with two working days' notice. ## Consumable stock Anodes, anti-fouling guards and gland kits are held as rolling stock and reordered at the reorder level marked on the bin. The stores controller reviews reorder levels each quarter against the previous four quarters of consumption. ## Couriers The courier cut-off is 15:30 for next-day delivery within the United Kingdom. Anything handed over after the cut-off travels the following working day. Dangerous goods - which means any lithium cell over the threshold on the shipping matrix - need the packing declaration signed by a trained shipper, and there are two in the building. ## What the depot does not do The depot does not calibrate. An instrument that needs a certificate goes to the laboratory, is booked in under its own job number, and comes back to the depot only once the certificate has been signed. ## Commissioning: before travelling --- result 2: A05_depot_and_commissioning_note.md chunk 1 of 2 relevancy=0.0000 similarity=0.5965 ## Commissioning: before travelling Confirm the site permit is in place and that the structure is accessible at the tide state you have planned for. Confirm the instrument's job number and that the certificate in the case matches the serial number on the housing. Take the torque wrench; the sensing face is the one part of this job that does not tolerate improvisation. ## Commissioning: mounting Mount the instrument on the mounting bracket with the sensing face pointing into the flow, not across it. Leave at least 150 mm of clear water in front of the face. On a structure with a grating, mount below the grating rather than through it, so that the face is not shaded by a bar that will collect weed. Bracket bolts are stainless M10, tightened to 22 Nm. Do not substitute a galvanised bolt: the sacrificial anode is sized for the stainless arrangement and the wrong metal in the water changes what corrodes. ## Commissioning: cable routing Route the deck cable away from any winch path and secure it every 400 mm. Leave a drip loop below the gland. Where the cable passes a sharp edge, fit the sleeve from the gland kit rather than taping the cable. Do not coil surplus cable against the instrument housing; surplus goes in a loose figure of eight on the deck stand. ## Commissioning: checks before leaving site With the instrument in the water and the gateway powered, confirm a reading appears at the gateway within two minutes, and that the temperature reading is within half a degree of a hand-held thermometer in the same water. Confirm the salinity reading is stable over five minutes; a reading that wanders is usually air trapped in the cell, cleared by lowering and raising the instrument twice. Record the gateway signal strength on the commissioning sheet. Leave the certificate in the site file, not in the instrument case. Leave one spare gland kit and one spare anode with the site's own stores, and take the packaging away. Send back the signed commissioning sheet, photographs of the mounting from two angles, and the serial numbers of anything fitted, on the same day. A commissioning sheet that arrives a week later has usually lost the detail that matters. ==================================================================================================== 3. region = nordic request body: {"question": "Which depot holds the Tolvan A3 loan pool?", "numResults": 5, "metadata-filters": [{"metadata.region": ["nordic"]}]} response: HTTP 200, 3 results, answering file returned: NO --- result 1: A06_nordic_service_addendum.docx chunk 0 of 3 relevancy=0.9676 similarity=0.7572 Nordic Service Addendum Fenwake Instruments Ltd - Norway, Sweden and Denmark 1. What this addendum covers This addendum sets out how service work is delivered for customers in Norway, Sweden and Denmark. It covers logistics, customs, mobilisation, the regional depot and how loan stock is requested. It does not restate commercial terms, and it does not describe the goods warranty carried by a new instrument. 2. Regional depot The regional depot is at Bergen, on the Damsgard side of the harbour, and is open 07:00 to 16:00 local time, Monday to Friday. It is staffed by two engineers and a stores controller. 2.1 What the depot holds Item Held at Bergen Note Brannoc loan pool Two units Issued against a signed loan note Tolvan C5 spares kit One full kit Pressure housings, o-ring sets, end caps Consumables Rolling stock Anodes, guards, gland kits Deck cable, armoured 300 m drum Cut to length on request --- result 2: A06_nordic_service_addendum.docx chunk 1 of 3 relevancy=0.2473 similarity=0.7651 Loan pool stock is counted on the first working day of each month and the count is sent to the service desk lead the same day. A discrepancy is investigated before the next issue. 3. Requesting a loan unit 3.1 Who to call Loan requests from customers in the region are met from the Bergen depot. Ring the depot rather than raising a stores request in the system: the stores queue is worked from the workshop and adds a day to anything that could have been handed over the counter. 3.2 What can be lent The Bergen loan pool covers the Brannoc telemetry gateway. A gateway goes out with its own SIM and a configuration file matching the customer's deployment. Where a customer needs an instrument the depot does not hold as loan stock, the depot raises a request against central stores and tells the customer the same day what can and cannot be met locally. Do not promise a loan unit before the depot has confirmed one is free. 3.3 The loan note Every loan is recorded on a signed loan note carrying the ticket number, the serial number issued and the date it is due back. Ten working days is the standard loan period, counted from the day the customer's own instrument is returned to service. An overdue loan is chased by the stores controller at ten and at twenty working days, and after that by the service desk lead. 3.4 Condition on return A returned loan unit is inspected, cleaned and re-certified before it goes back into the pool. A unit returned with a broken calibration seal is treated as damaged, quoted for repair, and does not go back into the pool until the laboratory has passed it. 4. Customs and export Instruments moving between the workshop and a Norwegian site travel under a temporary admission carnet. The carnet number goes on the ticket before the instrument leaves the building; an instrument that travels without one is held at the border and the ticket clock is suspended until it is released. 4.1 Repairs that cross a border Where a repair cannot be completed at Bergen and the instrument must return to the workshop, the depot raises a return note and the customer is told the same day. Return shipping is arranged by the depot, never by the customer, so that the carnet stays valid. 5. Mobilisation --- result 3: A06_nordic_service_addendum.docx chunk 2 of 3 relevancy=0.0000 similarity=0.6670 5. Mobilisation Offshore attendance in the region is mobilised through the customer's own vessel wherever one is available. Where it is not, the depot charters through a local agent. Mobilisation requires offshore survival certification current on the day of sailing, and the depot checks certification before booking. 6. Language Service reports are written in English. On request, the depot provides a Norwegian summary of the findings and the actions taken, prepared by the stores controller and checked by the attending engineer. 7. Subcontractors Two subcontractors are approved for lifting and diving support in the region: Hordaland Subsea AS and Kattegat Marine Services. Neither is authorised to open an instrument or to break a calibration seal. ==================================================================================================== 4. region = nordic or uk request body: {"question": "Which depot holds the Tolvan A3 loan pool?", "numResults": 5, "metadata-filters": [{"metadata.region": ["nordic", "uk"]}]} response: HTTP 200, 5 results, answering file returned: YES --- result 1: A05_depot_and_commissioning_note.md chunk 0 of 2 relevancy=0.9999 similarity=0.7437 # Depot, spares and commissioning - working note Bristol depot and UK commissioning engineers. Not a contractual document. ## The depot The Bristol depot sits behind the workshop on the Avonmouth side and is open 07:00 to 17:00, Monday to Friday. Out of hours, the duty engineer holds a key and may draw stock, recording what was taken on the ticket before leaving the building. ## Loan stock The Bristol depot holds the Tolvan A3 loan pool: six calibrated units reserved for Critical cover customers. A loan unit goes out configured for the customer's deployment, with a current certificate in the case, so that it can be rigged without a bench check. Loan units are issued against a signed loan note naming the ticket, the serial number that went out and the serial number it stands in for. The stores controller counts loan stock on the first working day of each month. A customer on Standard or Extended cover may borrow a unit where one is free, but has no reservation on it: a Critical cover customer takes precedence and the borrowed unit is recalled with two working days' notice. ## Consumable stock Anodes, anti-fouling guards and gland kits are held as rolling stock and reordered at the reorder level marked on the bin. The stores controller reviews reorder levels each quarter against the previous four quarters of consumption. ## Couriers The courier cut-off is 15:30 for next-day delivery within the United Kingdom. Anything handed over after the cut-off travels the following working day. Dangerous goods - which means any lithium cell over the threshold on the shipping matrix - need the packing declaration signed by a trained shipper, and there are two in the building. ## What the depot does not do The depot does not calibrate. An instrument that needs a certificate goes to the laboratory, is booked in under its own job number, and comes back to the depot only once the certificate has been signed. ## Commissioning: before travelling --- result 2: A06_nordic_service_addendum.docx chunk 0 of 3 relevancy=0.9676 similarity=0.7572 Nordic Service Addendum Fenwake Instruments Ltd - Norway, Sweden and Denmark 1. What this addendum covers This addendum sets out how service work is delivered for customers in Norway, Sweden and Denmark. It covers logistics, customs, mobilisation, the regional depot and how loan stock is requested. It does not restate commercial terms, and it does not describe the goods warranty carried by a new instrument. 2. Regional depot The regional depot is at Bergen, on the Damsgard side of the harbour, and is open 07:00 to 16:00 local time, Monday to Friday. It is staffed by two engineers and a stores controller. 2.1 What the depot holds Item Held at Bergen Note Brannoc loan pool Two units Issued against a signed loan note Tolvan C5 spares kit One full kit Pressure housings, o-ring sets, end caps Consumables Rolling stock Anodes, guards, gland kits Deck cable, armoured 300 m drum Cut to length on request --- result 3: A06_nordic_service_addendum.docx chunk 1 of 3 relevancy=0.2473 similarity=0.7651 Loan pool stock is counted on the first working day of each month and the count is sent to the service desk lead the same day. A discrepancy is investigated before the next issue. 3. Requesting a loan unit 3.1 Who to call Loan requests from customers in the region are met from the Bergen depot. Ring the depot rather than raising a stores request in the system: the stores queue is worked from the workshop and adds a day to anything that could have been handed over the counter. 3.2 What can be lent The Bergen loan pool covers the Brannoc telemetry gateway. A gateway goes out with its own SIM and a configuration file matching the customer's deployment. Where a customer needs an instrument the depot does not hold as loan stock, the depot raises a request against central stores and tells the customer the same day what can and cannot be met locally. Do not promise a loan unit before the depot has confirmed one is free. 3.3 The loan note Every loan is recorded on a signed loan note carrying the ticket number, the serial number issued and the date it is due back. Ten working days is the standard loan period, counted from the day the customer's own instrument is returned to service. An overdue loan is chased by the stores controller at ten and at twenty working days, and after that by the service desk lead. 3.4 Condition on return A returned loan unit is inspected, cleaned and re-certified before it goes back into the pool. A unit returned with a broken calibration seal is treated as damaged, quoted for repair, and does not go back into the pool until the laboratory has passed it. 4. Customs and export Instruments moving between the workshop and a Norwegian site travel under a temporary admission carnet. The carnet number goes on the ticket before the instrument leaves the building; an instrument that travels without one is held at the border and the ticket clock is suspended until it is released. 4.1 Repairs that cross a border Where a repair cannot be completed at Bergen and the instrument must return to the workshop, the depot raises a return note and the customer is told the same day. Return shipping is arranged by the depot, never by the customer, so that the carnet stays valid. 5. Mobilisation --- result 4: A06_nordic_service_addendum.docx chunk 2 of 3 relevancy=0.0000 similarity=0.6670 5. Mobilisation Offshore attendance in the region is mobilised through the customer's own vessel wherever one is available. Where it is not, the depot charters through a local agent. Mobilisation requires offshore survival certification current on the day of sailing, and the depot checks certification before booking. 6. Language Service reports are written in English. On request, the depot provides a Norwegian summary of the findings and the actions taken, prepared by the stores controller and checked by the attending engineer. 7. Subcontractors Two subcontractors are approved for lifting and diving support in the region: Hordaland Subsea AS and Kattegat Marine Services. Neither is authorised to open an instrument or to break a calibration seal. --- result 5: A05_depot_and_commissioning_note.md chunk 1 of 2 relevancy=0.0000 similarity=0.5965 ## Commissioning: before travelling Confirm the site permit is in place and that the structure is accessible at the tide state you have planned for. Confirm the instrument's job number and that the certificate in the case matches the serial number on the housing. Take the torque wrench; the sensing face is the one part of this job that does not tolerate improvisation. ## Commissioning: mounting Mount the instrument on the mounting bracket with the sensing face pointing into the flow, not across it. Leave at least 150 mm of clear water in front of the face. On a structure with a grating, mount below the grating rather than through it, so that the face is not shaded by a bar that will collect weed. Bracket bolts are stainless M10, tightened to 22 Nm. Do not substitute a galvanised bolt: the sacrificial anode is sized for the stainless arrangement and the wrong metal in the water changes what corrodes. ## Commissioning: cable routing Route the deck cable away from any winch path and secure it every 400 mm. Leave a drip loop below the gland. Where the cable passes a sharp edge, fit the sleeve from the gland kit rather than taping the cable. Do not coil surplus cable against the instrument housing; surplus goes in a loose figure of eight on the deck stand. ## Commissioning: checks before leaving site With the instrument in the water and the gateway powered, confirm a reading appears at the gateway within two minutes, and that the temperature reading is within half a degree of a hand-held thermometer in the same water. Confirm the salinity reading is stable over five minutes; a reading that wanders is usually air trapped in the cell, cleared by lowering and raising the instrument twice. Record the gateway signal strength on the commissioning sheet. Leave the certificate in the site file, not in the instrument case. Leave one spare gland kit and one spare anode with the site's own stores, and take the packaging away. Send back the signed commissioning sheet, photographs of the mounting from two angles, and the serial numbers of anything fitted, on the same day. A commissioning sheet that arrives a week later has usually lost the detail that matters. ==================================================================================================== 5. Control: origin = file-upload request body: {"question": "Which depot holds the Tolvan A3 loan pool?", "numResults": 5, "metadata-filters": [{"origin": ["file-upload"]}]} response: HTTP 200, 5 results, answering file returned: YES --- result 1: A05_depot_and_commissioning_note.md chunk 0 of 2 relevancy=0.9999 similarity=0.7437 # Depot, spares and commissioning - working note Bristol depot and UK commissioning engineers. Not a contractual document. ## The depot The Bristol depot sits behind the workshop on the Avonmouth side and is open 07:00 to 17:00, Monday to Friday. Out of hours, the duty engineer holds a key and may draw stock, recording what was taken on the ticket before leaving the building. ## Loan stock The Bristol depot holds the Tolvan A3 loan pool: six calibrated units reserved for Critical cover customers. A loan unit goes out configured for the customer's deployment, with a current certificate in the case, so that it can be rigged without a bench check. Loan units are issued against a signed loan note naming the ticket, the serial number that went out and the serial number it stands in for. The stores controller counts loan stock on the first working day of each month. A customer on Standard or Extended cover may borrow a unit where one is free, but has no reservation on it: a Critical cover customer takes precedence and the borrowed unit is recalled with two working days' notice. ## Consumable stock Anodes, anti-fouling guards and gland kits are held as rolling stock and reordered at the reorder level marked on the bin. The stores controller reviews reorder levels each quarter against the previous four quarters of consumption. ## Couriers The courier cut-off is 15:30 for next-day delivery within the United Kingdom. Anything handed over after the cut-off travels the following working day. Dangerous goods - which means any lithium cell over the threshold on the shipping matrix - need the packing declaration signed by a trained shipper, and there are two in the building. ## What the depot does not do The depot does not calibrate. An instrument that needs a certificate goes to the laboratory, is booked in under its own job number, and comes back to the depot only once the certificate has been signed. ## Commissioning: before travelling --- result 2: A06_nordic_service_addendum.docx chunk 0 of 3 relevancy=0.9676 similarity=0.7572 Nordic Service Addendum Fenwake Instruments Ltd - Norway, Sweden and Denmark 1. What this addendum covers This addendum sets out how service work is delivered for customers in Norway, Sweden and Denmark. It covers logistics, customs, mobilisation, the regional depot and how loan stock is requested. It does not restate commercial terms, and it does not describe the goods warranty carried by a new instrument. 2. Regional depot The regional depot is at Bergen, on the Damsgard side of the harbour, and is open 07:00 to 16:00 local time, Monday to Friday. It is staffed by two engineers and a stores controller. 2.1 What the depot holds Item Held at Bergen Note Brannoc loan pool Two units Issued against a signed loan note Tolvan C5 spares kit One full kit Pressure housings, o-ring sets, end caps Consumables Rolling stock Anodes, guards, gland kits Deck cable, armoured 300 m drum Cut to length on request --- result 3: A10_tolvan_a3_product_overview.md chunk 0 of 2 relevancy=0.8302 similarity=0.7045 # Tolvan A3 - product overview The Tolvan A3 is a conductivity and temperature sensor built for continuous deployment in estuarine and coastal water. It is the instrument most of our customers meet first, and most of the questions the service desk answers are about this one. ## What it measures The instrument reports conductivity, temperature and a derived practical salinity. Conductivity is measured with an inductive cell, which has no exposed electrodes to foul or to wear, and temperature with a thermistor mounted in the same flow path so that the two readings describe the same parcel of water. Pressure is not measured; where a depth record is needed, the instrument is paired with a separate pressure sensor on the same mooring. ## Where it is used Typical deployments are estuary monitoring for a regulator, intake monitoring for a water treatment works, and baseline surveys ahead of construction in a harbour. It is rated for continuous immersion to fifty metres. Deeper work uses the Tolvan C5, which shares the sensing arrangement in a pressure housing rated considerably deeper. ## How it is powered and read On a mooring, the instrument runs from an internal battery pack and logs to internal memory. On a cabled installation it is powered over the same cable that carries its data, and reports continuously to the Brannoc telemetry gateway, which forwards to the customer's own system. The two modes are configured at commissioning and are not switched in the field. ## Fouling and cleaning In estuarine water the practical limit on deployment is biological fouling rather than power or memory. An anti-fouling guard and a sacrificial anode are fitted at commissioning and replaced at each service visit. Customers in warm or nutrient-rich water are advised to shorten the interval between visits rather than to clean the sensing face themselves, because the inductive cell is easily damaged by an abrasive. ## Calibration Every instrument leaves the laboratory with a signed certificate recording the as-found and as-left bias at four reference points across the working range. The recommended recalibration interval for the Tolvan A3 is 22 months from the date of the last certificate. An instrument returned early because of a suspected drift is checked as found before anything is adjusted, so that the drift can be quantified rather than merely corrected. --- result 4: A06_nordic_service_addendum.docx chunk 1 of 3 relevancy=0.2473 similarity=0.7651 Loan pool stock is counted on the first working day of each month and the count is sent to the service desk lead the same day. A discrepancy is investigated before the next issue. 3. Requesting a loan unit 3.1 Who to call Loan requests from customers in the region are met from the Bergen depot. Ring the depot rather than raising a stores request in the system: the stores queue is worked from the workshop and adds a day to anything that could have been handed over the counter. 3.2 What can be lent The Bergen loan pool covers the Brannoc telemetry gateway. A gateway goes out with its own SIM and a configuration file matching the customer's deployment. Where a customer needs an instrument the depot does not hold as loan stock, the depot raises a request against central stores and tells the customer the same day what can and cannot be met locally. Do not promise a loan unit before the depot has confirmed one is free. 3.3 The loan note Every loan is recorded on a signed loan note carrying the ticket number, the serial number issued and the date it is due back. Ten working days is the standard loan period, counted from the day the customer's own instrument is returned to service. An overdue loan is chased by the stores controller at ten and at twenty working days, and after that by the service desk lead. 3.4 Condition on return A returned loan unit is inspected, cleaned and re-certified before it goes back into the pool. A unit returned with a broken calibration seal is treated as damaged, quoted for repair, and does not go back into the pool until the laboratory has passed it. 4. Customs and export Instruments moving between the workshop and a Norwegian site travel under a temporary admission carnet. The carnet number goes on the ticket before the instrument leaves the building; an instrument that travels without one is held at the border and the ticket clock is suspended until it is released. 4.1 Repairs that cross a border Where a repair cannot be completed at Bergen and the instrument must return to the workshop, the depot raises a return note and the customer is told the same day. Return shipping is arranged by the depot, never by the customer, so that the carnet stays valid. 5. Mobilisation --- result 5: A06_nordic_service_addendum.docx chunk 2 of 3 relevancy=0.0000 similarity=0.6670 5. Mobilisation Offshore attendance in the region is mobilised through the customer's own vessel wherever one is available. Where it is not, the depot charters through a local agent. Mobilisation requires offshore survival certification current on the day of sailing, and the depot checks certification before booking. 6. Language Service reports are written in English. On request, the depot provides a Norwegian summary of the findings and the actions taken, prepared by the stores controller and checked by the attending engineer. 7. Subcontractors Two subcontractors are approved for lifting and diving support in the region: Hordaland Subsea AS and Kattegat Marine Services. Neither is authorised to open an instrument or to break a calibration seal. ==================================================================================================== 6. region = nordic, no metadata. prefix request body: {"question": "Which depot holds the Tolvan A3 loan pool?", "numResults": 5, "metadata-filters": [{"region": ["nordic"]}]} response: HTTP 200, 0 results, answering file returned: NO
Request/response log: six searches, their filters and the passages returned
Open the text file ↗| ✓ | Expected: Do not return the document containing the answer when the search is limited to a subset without that answer.Found: The Nordic-only search returned 3 passages from the Nordic service addendum and left out the UK document containing the answer. |
The answering document was excluded, while related passages remained. Searches without the limit, within the answer's region, and across all uploaded files retrieved it. That distinguishes a respected restriction from an empty search or a filter that suppresses results generally.
Silent filter typo. The Nordic-region search using a filter name without its required prefix returned 0 results, with a success status and no error.
Relevance and similarity diverge. The third Nordic passage received a relevance score of 0.0000 and a similarity score of 0.6670. Filtering on relevance alone would drop that returned passage.
Configuration and setup
How this tool was set up for the run and what the test needed in place. Each row is a fact from the run's records; a fact the records do not hold is left out, not guessed.
How this scenario is graded
How we decide Pass, Fail and Not gradable. The same rules apply to every tool tested on this scenario.
Each test case gets one result per tool: Pass, Fail or Not gradable. A test case we haven't run yet shows Untested. There are no partial results.
- Pass: the tool did everything the test expected, and nothing it said contradicts the correct answer.
- Fail: at least one expected behaviour clearly didn't happen; the test case's result says which one and quotes the tool.
- Not gradable: our evidence couldn't settle the outcome (for example a record we needed is missing). It is never counted as a fail, and the test case's result says what's missing.
Where this sits in the benchmark
This page is one cell of a larger study: one tool, one scenario. Only this benchmark's frame appears here.
| Level | Name | Scope |
|---|---|---|
| Benchmark | Managed RAG → | 15 scenarios · 9 tools |
| Capability | Retrieval → | |
| Scenario | Retrieval is scoped to part of the documents → | |
| Tool | Vectorize.io → |
Global scenario definition → · Global capability definition → · Vectorize.io product page →
History of this result
What has happened to this result since it was first published. Runs and grades are never overwritten: a retest or a re-grade publishes a new result and keeps the earlier one readable.
Act on this result
Nothing filed here edits the run or the grade. A challenge opens a review, and a review can produce a new run or a re-grade — which becomes the current result and leaves this one in the history.
You run the same kind of test against your own setup and get the same behaviour.
Agree →Yours behaves differently. Tell us what you got, with a screenshot if you have one.
Disagree →Something here is wrong — a reference value, a transcription, a grade.
Report an issue →Tell us what changed and we schedule a rerun of the failing test case. The old result stays as history.
Vendor notice →The same record is available as structured data through the AI Demos MCP server, with the counts, the coverage and every per-test-case reason carried as fields.
Verify the proof files
These files support this result. Open a file to inspect the original evidence.
File fingerprints (SHA-256)
A fingerprint identifies the exact file used for this result.